I can’t believe we’re dealing with this again!
Widening Phase 2 Starts This Week!
Monday, 11/04/24 – Friday, 11/08/24
Daily: 9 AM – 4 PM
– Right lane closure on IH-10 EB from Anthony to Nashua Rd.
Crews will be milling and placing asphalt. Seriously, can we catch a break?
Thursday, 11/07/24
9 PM – 5 AM
– Full closure on IH-10 EB from Anthony, NM to Transmountain Rd.
Crews will be placing barriers and striping from the New Mexico state line to Anthony, TX. Another night of detours? Ugh.
Traffic Detour:
All traffic will exit at NM404 (Anthony, NM), turn right on NM404 (Ohara Rd), turn left on NM460 (Anthony Dr), then proceed towards Doniphan Dr. Turn left on Vinton Rd and continue towards South Desert to re-enter IH-10 EB on the Vinton On-Ramp. It’s a hassle, I know.
Saturday, 11/09/24 at 3 AM through Monday, 11/11/24 at 6 AM (51 hours)
– Full closure on IH-10 EB from Anthony, TX to Transmountain Rd.
Crews will be placing barriers and striping. Can we just finish this already?
Traffic Detour:
All traffic to exit at Anthony, TX, proceed on South Desert Blvd through the Anthony and Vinton intersections, and re-enter IH-10 EB at the Los Mochis on-ramp (before Transmountain Rd).
Future Upcoming Closures
Monday, 11/11/24 through Friday, 11/15/24
Daily: 9 AM – 4 PM
– Right lane closure on IH-10 WB from Nashua Rd to NM State Line.
Crews will be milling and placing asphalt. Just what we need, more delays.
Saturday, 11/16/24 through Monday, 11/18/24, 3 AM – 6 AM (51 hours)
– Full closure on IH-10 WB from Transmountain Rd to Anthony, TX.
Crews will be placing barriers and striping. Seriously, can we get this over with?
Traffic Detour:
All traffic will exit and proceed on North Desert after Los Mochis (Phase 3), continuing on North Desert Blvd through the Vinton and Anthony intersections, and re-enter IH-10 WB at the Anthony, TX on-ramp.
Note: All closures are subject to change based on weather and field conditions. Just what we need—more unpredictability!